Zixing Dongjiangwan Bridge under aerial photograph on December 16th
At present, the approach bridge engineering has been completed. The continuous beam of the main bridge was on the construction. The Dongjiangwan Bridge is the key node in the construction of Dongjiangwan new city, the length of 609 meters and width of 30.5 meters, the largest span of 125 meters. The whole bridge adopts the six lanes and double-sided asphalt concrete pavement with the standard of city grade I main roads, the design speed of 60 km per hour to be completed in May 2018.