Project Initiator: Chenzhou Municipal Bureau for Environment Protection
Zip Code: 423000
Project Content:
1. The construction begins at Ganxiping, the source of
2. Combined with the watercourse dredging up and tailings solidification, set up several tailing enrichment subsidiary plants along the river by echelon to form the solidifying capacity of 10,000t/d tailings when or after the enrichment of heavy metals.
3. Construct two concentration plants for comprehensive recycling of 2000t/d tin, lead, zinc, sulfur, iron and arsenic from tailings after the enrichment.
4. Construct a plant with smelting capacity of 3000t/a fine tin from tin concentrates.
The above construction will be carried out by stages. Item 1, 2, 3 will be carried out in the first stage and Item 4 will be carried out in the second stage.
Total Investment: USD 88.62 million
Cooperation Forms: equity joint venture, contractual joint venture